4 Rivers Surveying Inc. has completed and is continuing to work on many projects. Some of the projects are listed below. Some other projects are confidential and are not listed.
-
Ruby Pipeline for El Paso Corporation
4RS provided construction staking for spread 3 across northern Utah and Nevada. Completed in 2010.
-
ML 133 for Questar pipeline
4RS provided as-built surveying services as a subcontractor on this project of approximately 146 miles of pipeline in Wyoming. Completed in 2011.
-
ML 1400 for Northwest Pipeline
4RS is providing corridor control, construction staking, design topographic surveys, and as-built surveys in Idaho and Oregon. Ongoing.
-
Loop Line 1401 for Northwest Pipeline
4RS is providing construction staking, design topographic surveys, and as-built surveys in Idaho and Oregon. Ongoing.
-
Hamilton Lateral for Northwest Pipeline
4RS provided the design topographic survey, construction staking and as-built surveys for this project. Completed 2013.
-
Reno Lateral for Northwest Pipeline
4RS is providing construction staking, design topographic surveys, and as-built surveys. Ongoing.
-
Underground gas pipeline utility locates for PG&E
4RS provided all utility marking for approximately 1050 miles of underground gas pipeline in California. Completed 2013.
-
Pacific Connector Gas Pipeline for PCPL in Oregon
This is considered a mega project due to its extreme difficulty. It is approximately 240 miles long and is a 36 inch pipe through rugged and rocky terrain. 4RS is providing many surveying tasks for this project. We have committed many survey crews and will be on this project through completion. Ongoing.
-
Smart tool tracking for Enterprise
4RS provided tracking of smart tools (pigs) for 126 miles of pipeline in western Texas. Completed 2014.
-
Mountain Home Air Force Base radar site, power transmission
-
ALTA MESA Holdings, well sites and pipeline transmission
-
ALTA for Nagel Beverage
-
Mountain Home Air Force Base radar tower surveys
-
National Resources Conservation Service boundary survey of 15 sections
-
ALTA of housing complex in Reno Nevada
-
Bureau of Reclamation aerial Lidar control for Lucky Peak, Arrow Rock and Anderson Ranch dams and reservoirs
-
Harmon gathering line for Snake River Oil and Gas & Northwest Gas Processing, consisting of nine miles of pipeline going through 11 Sections. Prepared design topographic surveys, construction staking, boundary, easements, and as-built surveys for this project.
-
Redding CA control network for Bureau of Reclamation consisting of 1500 square miles of photogrammetric control points.